Client:
Grand Valley Local School District
Capacity: 1,700
Construction Cost: N/A
Completion Date: 2006 |
|
|
On the site of a former farm
plat Olsavsky Jaminet Architects developed a new Athletic
Complex to accommodate the district’s football and track teams;
work included a new football field with subsurface drainage and
irrigation system. This also entailed completion of a
master planned drainage system for the entire complex. In
addition, a 1000-seat home stands and 700-seat visitor’s
bleacher were constructed; further, an eight lane all-weather
track was developed to complement the football field. A
new concession/restroom building was constructed, along with
walkways encircling the complex. An entryway was created
as a monumental main entry to the complex. Support items
incorporated with the project were fencing and field lights.
The complex was completed in 8 months. |
|
|